Radiator hoses found and installed...moved the master cyl up a few degrees with a small wedgie........prepping headers for the coating..........oil press gage came in today...need another line for the fuel pressure, reg to outside unit..other line came with the kit.........line should be around 18 to 24 inches..........hood scoop is ready for final sanding prior to paint..center support installed.
Sun came out for a bit..........only in the 50s...but much better than last week..
Firebird getting brakes/lines/booster/master, etc...fuel lines routed and ready for engine install..some repair to block with helicoils...........headers MUST go in first...........arggggggggggggggg! Ken and Chuck working on this........Kenny working, Chuck talking.....lol
M.
M. |